Logotype Teknik & Dokumentation AB


Startpage

Företagspresentation

Company presentation

Referenslista

Reference list

       info@teknodok.com
  
  
  
  
  


  Year
  1997
  1998

  Client
  Borås Wäfveri AB
  (Textile industry)

  Investment
  1 150 000 EUR

  Project
  Design and
  Project Management

  Description
  Converting from high pressure steam
  (35 bar) to low pressure steam
  (7 bar) 45 GWh/year.
  Converting Heating System from
  steam to hot water, 15 GWh/year.
  Converting Textile Machines from
  steam to thermal oil or LPG.
  Rebuilding Storage and Handling
  of Caustic Soda NaOH.
  Renovating and up-grading
  Condensate System.
  Installation of Steam Boiler, 11 MW
  12 bar and a Hot Water Boiler 8 MW
  including Peripheral Equipment.
  Design of Piping System for
  Certified Inspection.
  Converting to PC-based system
  (Factory Link) for Operational and
  Control Surveillance of Heat Recovery
  and Energy Production.

  
  1997

  
  Farm Plant Eesti AS
  (Feed factory)

  
  150 000 EUR

  
  Design and
  Proj. Mgm.
  
  Installation of new Steam Generating
  System and Equipment for an Animal
  Feed factory in Estonia.

  
  1998

  
  Krenholm Holding Ltd.
  (Textile industry)

  
  

  
  Advisory
  Consultant

  
  Krenholm Holding Ltd. is an
  Estonian Textile Group
  (approx. 5 700 employees).
  Advisor to Management of
  Maintenance Department
  (approx. 700 employees)
  in creating a Project
  Organisation for managing
  larger projects.
  Supporting Maintenance
  Management as an Expertise
  assistance for various
  organisation, energy and
  process-technical matters.

  
  1998

  
  Krenholm Holding Ltd.
  (Textile industry)

  
  350 000 EUR

  
  Design
  
  Design and calculation
  of system for heat
  recovery from
  Waste Water System.

  
  1998

  
  Krenholm Holding Ltd.
  (Textile industry)


  
  1 850 000 EUR

  
  Design and Member
  of Proj. Group
  
  Installation of a new Natural
  Gas based Steam and Heat
  generating production
  plant (45 MW).
  Co-operating with Estivo
  one of Estonia's leading
  Technical Consult Bureaus.

  
  1998

  
  Vänfor HB / Fori HB
  (Feed factory)


  
  

  
  Documentation
  
  Documentation of existing Steam
  System at a Feed Factory in Sweden.
  Designing 3-dimensional Flow Charts.
  Specify System Components.

  
  1998
  1999

  
  Odal Energi AB
  (District heating)

  
  

  
  Design
  
  Pilot studies and quotes concerning
  Biomass Fuel based District Heating
  Systems for small communities
  (4 - 12 GWh/year).

  
  1999

  
  Grästorp Fjärrvärme AB
  (District heating)


  
  

  
  Documentation
  
  District Heating System in two
  existing Production Plants.
  Designing 3-dimensional Flow Charts.

  
  1999

  
  Pakenso Tambox AB
  (Paper mill)


  
  

  
  Advisory Consultant
  
  Advisory help in establishing contract
  text when planning future connection
  to District Distribution System
  for heating and steam.


  
  1999

  
  Fori HB / Norrköping
  (Feed factory)

  
  

  
  Planning
  and Design

  
  Rebuilding a 12 bar Steam
  System for Certified Inspection.
  Design required certified drawings.
  Responsible for inspection by Official
  Inspection Agency.Description of
  Contractor work for other systems.
  Design of antibacterial growth
  heat retaining unit.


  
  1999

  
  Sical AB
  (Manufacturer
  of heat
  recovery equip.)


  
  400 000 EUR

  
  Design and Proj.
  Management


  
  Plant for cleansing and heat
  recovery of contaminated
  air from process machines (2 GWh/year).


  
  1999
  2000

  
  Grästorp Fjärrvärme
  AB
  (District heating)


  
  140 000 EUR

  
  Planning and
  Documentation


  
  Renovate / Rebuild Flue
  Gas cleansing for a 3 MW
  Solid Fuel Boiler.
  Create maintenance
  instructions.

  
  2000

  
  Odal Energi AB
  (District heating)
  
475 000 EUR

  
  Planning
  
  Questionnarie to base a request for
  a quote regarding rebuilding and
  installation of a 2,5 MW Biomass (Straw)
  District heating boiler.
  
  2000

  
  Sical AB / Nutricia
  Ireland Ltd.
  
250 000 EUR

  
  Planning
  and design
  
  Heat recovery plant for Food Industry in
  Ireland. Recovery rate 4,5 GWh/year
  
  2000

  
  Såtenergi AB
  (District heating)
  
  50 000 EUR

  
  Design
  
  Fire prevention and fire-fighting
  equipment for a 4 MW Biomass (straw)
  District heating plant.
  
  2000

  
  Odal Energi AB
  (District heating)
  
1 700 000 EUR

  
  Planning
  
  Pilot study and quote for Biomass Fuel
  based District Heating System for a
  small community in eastern Sweden.
  10 GWh/year.
  
  2000

  
  Odal Energi AB
  (District heating)
  
3 500 000 EUR

  
  Planning
  
  Pilot study and quote for Biomass Fuel
  based District Heating System for a
  medium size community in eastern Sweden.
  30 GWh/year.
  
  2000

  
  Konvex AB
  (Processing by products
  from Slaughter-industry)
  
9 500 000 EUR

  
  Planning
  and Research
  
  Planning and development of a incinerator
  plant based on by-products from
  slaughter-industry
  
  2000

  
  Fori HB
  (Feed factory)
  
  

  
  Advisory
  Consultant
  
  Trouble-shooting of existing steam
  systems in feed processing plants
  
  2000
  2001

  
  Grästorp Fjärrvärme AB,
  Farmarenergi AB
  District heating

  
  

  
  Inspection
  
  Certified inspection of sub-system
  and boiler plants.
  
  2001
  2002

  
  Sical AB

  
  1 150 000 €

  
  Planning
  Project management
  Design
  
  Planning, design and project management
  for a heat recovery system at a textile
  industry in Estonia.
  Installation management included.
  
  2002

  
  Grästorp Fjärrvärme AB

  
  565 000 €

  
  Project management
  
  Exchange of 3.5 MW solid fuel boilers
  for district heating. Also included
  responsibility for all purchasing.
  
  2002

  
  Konvex AB

  
  72 000 €

  
  Design
  
  Handling system for animal carcass fuel.
  
  2003

  
  Farmarenergi AB

  
  

  
  Environmental
  Analysis
  
  Environmental analysis prior to ISO 14000
  certification.
  
  2003
  2004

  
  Swedish Fortification-
  Administration,
  Lantmännen Energi AB,
  etc

  
  

  
  Risk Analysis
  
  Risk analysis of pressure vessels and
  piping according to AFS 2002:1.
  
  2004

  
  Lantmännen
  Feed Plants

  
  

  
  Study
  
  Studies regarding bio fuel based steam
  production at feed plants.
  
  2004

  
  SBE Energi AB

  
  

  
  Study
  
  Studies regarding local heating projects
  300 - 600 kW.
  
  2005

  
  Lantmännen
  Seed Plants

  
  

  
  Planning and Design
  
  New steam boiler plant for "ecological" steam
  production without chemical additives.
  Designing steam- and hotwater pipes
  from solid fuel boiler.
  
  2005

  
  Acanova

  
  

  
  Planning and Design
  
  Piping design for Thermoseed ecological
  seed treatment without using pesticides.
  
  2005

  
  Lantmännen
  Feed Plants

  
  

  
  Study,
  Investigation
  
  Investigation and proposal for energy
  saving and heat recovery.
  Documentation and trouble-shooting
  existing hotwater system.
  
  2005

  
  SBE Energi AB

  
  

  
  Study, Design
  
  Proposal for connecting an existing solid
  fuel boiler to a district heating grid.

           Copyright Teknik & Dokumentation AB 1999
           Produced by Ledge Ing AB